Services – Proof Load Tests

Proof Load Tests not to exceed 125% of rated capacity are recommended upon relocation of an existing crane or hoist, after structural or load bearing repairs or re-commissioning a unit, which has been idle for a period of more than six months (reference Standards – 29 CFR, Overhead and Gantry Cranes. – 1910.179).  Certain problems can best be identified during a Proof Load Test.  Certified solid steel weights for lower capacity units and water weights for larger capacity units are employed.  Load Test Certificates are issued to the customer and maintained in our files.

For more information on your Load Test needs CLICK HERE!

Vendors